Our Process
See our simple process for obtaining a quote and finalising your project with iBuild Group​
01.
Meet with us to discuss your requirements
02.
Talk with a draft person to have your plans drawn up. You can use your preferred draft person or speak with us for a recommendation
03.
Receive a preliminary quote from iBuild Group (Vic)
04.
Have engineering, soil reports, energy rating report, BAL (Bushfile Attack Level) report finalised
05.
Receive a final quote from iBuild Group (Vic)
06.
Organise required documentation (for example, Copy of Title, Legal point of discharge for South East Water) to submit to a building surveyor
07.
Sign contracts with iBuild Group (Vic). Warranty Insurance is at this stage issued by iBuild Group (Vic)
08.
Building Permit issued by the relevant building surveyor
09.
Construction usually begins within two weeks of Building Permit being issued
10.
The stages for the construction of your home are listed in the iBuild Group (Vic) Contract